Monday, March 31, 2014

Neighboring Lot - Post 6

This lot is being prepared to pour the concrete for the post-tension slab.



"Before a post-tension slab is poured, high-strength steel strands or cables, called tendons, are laid in a tight grid.  These help support and give strength to the slab once it has cured.  The tendons are sheathed in plastic so that they do not directly touch the concrete.  After the grid is made, the concrete is poured.  The concrete is allowed to cure to about 75% of the way, at which pint post-tensioning occurs.  Each of the tendons in the post-tension slab is pulled tight, using a hydraulic jack.  The tendons are usually pulled to a tension of 25,000 pounds per square inch.  Once the cables have reached the designated tension, they are anchored in the concrete, and the slab is allowed to fully cure."