Before photos - with a test patch of my chosen paint color (cotton twill yellow):
Prep work - the hardest job!
Making progress!
I had searched for a backsplash installer. We got two estimates of $1500.00 and $1575.00. And those prices didn't include the tile. Wow! Nope, not doing that! Finally, we settled on Lowe's to provide a tiler for us, for about 1/3 of the cost of the others. Our next job was to remove the 4 inch granite backsplash riser. We were advised to not do this, because: 1. the granite riser might have been applied with adhesive all along its back and would probably destroy the wallboard behind it, and 2. possibly the countertop didn't go all the way to the wall just because the builder knew that he was installing a 4 inch granite backsplash riser. If there was too large a gap between the countertop and the back wall, the backsplash tile wouldn't fill in the gap. But we could see on one side of the stove that the countertop did reach all the way to the wall. So we forged ahead and Mert was tasked with removing the riser, and worrying how it was going to go. He had watched a video on "youtube."
Tools are ready:
The upright granite pieces need to come off.
Well, that was pretty easy! And that section was only glued in 3 small spots.
One down - more to do.
The second piece is off.
Uh-oh! The builder cut a hole for an outlet where it should be IF he was going to install backsplash tiles. But that wasn't the plan when the house was built. A granite riser was to go right there where the hole is, so he had to cut another hole and install the outlet up higher. And he did NOT patch the hole.
There are two holes like that, one on each side of the sink. Now Mert has to figure out how to patch them.
Made it to the corner and around to the stove:
Last section - DONE!
Then Mert took off the trim piece underneath the windowsill - more holes to patch. But he has it figured out.
Whew! That task went a lot better than we had expected.
And then Mert got busy filling all those holes.
Cutting sheetrock:
Filling up the holes and gaps:
Now the walls are ready for the tile installer.
Meanwhile, we got the tiles and I sealed them with 3 coats of sealer. Hope that is enough!
Here we go. Install day!!!
Grout time:
All finished! Wow!
It's look super perfect. We could never have done this nice a job and are glad we didn't tackle it. It took the tiler from 10 AM until 7 PM, working straight through with no breaks. He had to cut around ELEVEN outlets.
Now to put our beautiful 'new' kitchen back together.
Now it is officially my kitchen!
Antique trivets grace each side of Linn's kitchen sign:
And a new very cheerful, happy sign:
We are SO pleased with the result!